Nearly the end of 2016
Would just like to
wish everybody all the best
for
2017
Anyways down to other stuff
after
striping out the fiddle yard for Pine Road to make room for the extension, basically to give the trains a slightly longer run through the rolling hills of Dorset.
A stackable storage yard
Perhaps should have shopped around but these racking, shelving thingy's aren't what you would call cheap. £2.99 for one shelf bracket (so you need at least two obviously) and £5.99 for one upright.
Nearly 30 quid for this little lot. Well, it's done now.
Pine Road storage facility |
Pine Road reconnected.
It's nice to have her up and running again.
I still haven't decided what to do on this section. To be honest their isn't that much room so am tempted to play it safe. A Level crossing and keepers house to hide the entrance to the storage yard, (can't put a bridge there, someone will plonk a bus on it) A couple more thatch cottages perhaps. At least she is running again.
26.5 Inches.
That's the radius of the curve...eeeek, alas my Two Adams Radials run around it quite happily.
The other Major problem is,
i can't find the Backscene that was used on Pine Road to continue it on. Stalemate
Pine Road |
No comments:
Post a Comment